All of the old corroded metal pipes are out and the cold water PVC is in:


Hopefully the hot water and sewer will be complete tomorrow. We found out today that the old water heater was split, so we will be replacing that :) also, we have to change the layout of the new bathroom because of how the foundation is laid out. Here are some pics of the framing:


This is the view from the bedroom, to the right will be closet, on the left of the new wall toward the window will be the toilet (tank against the framing).


This is the view to the left from the bedroom; framing for the new shower. 

Finally, it looks like the support beam that runs the length of the house will need to be jacked up/reinforced. Good times!